
Spare parts and consumables	The proposed incinerator systems shall include 
all necessary spare parts, PPE, and consumables required for 2 years of operation. 
The supplier is to provide a proposed list of spare parts for the incinerators. Mandatory spare parts must include as a minimum:
| Incinerator Items/Model | HICLOVER TS5(PLC) | HICLOVER TS10(PLC) | HICLOVER TS20(PLC) | 
| Burn Rate (Average) | 5-10 kg/hour | 10-20 kg/hour | 20-30 kg/hour | 
| Feed Capacity(Average) | 10kg/feeding | 20kg/feeding | 40kg/feeding | 
| Control Mode | PLC Automatic | PLC Automatic | PLC Automatic | 
| Primary Combustion Chamber | 52L | 100L | 210L | 
| Internal Dimensions | 50x35x30cm | 50x50x40cm | 65x65x50cm | 
| Secondary Chamber | 26L | 50L | 110L | 
| Smoke Filter Chamber | Yes | Yes | Yes | 
| Feed Mode | Manual | Manual | Manual | 
| Voltage | 220V | 220V | 220V | 
| Power | 0.5Kw | 0.5Kw | 0.5Kw | 
| Burner Type | Italy Brand | Italy Brand | Italy Brand | 
| Oil Consumption (kg/hour) | 4 | 6 | 8 | 
| N.Gas Consumption (m3n/hour) | 6.2-11.4 | 6.2-11.4 | 8-15.7 | 
| Temperature Monitor | Yes | Yes | Yes | 
| Temperature Thermometer | Corundum Probe Tube, 1400℃Rate. | Corundum Probe Tube, 1400℃Rate. | Corundum Probe Tube, 1400℃Rate. | 
| Temperature Protection | Yes | Yes | Yes | 
| Automatic Cooling | Yes | Yes | Yes | 
| Automatic False Alarm | Yes | Yes | Yes | 
| Automatic Protection Operator(APO) | |||
| System Testing Model | Yes | Yes | Yes | 
| Time Setting | Yes | Yes | Yes | 

“• thermocouple
• temperature gauge
• fire rope
• burner
• induction air fan
• digital temperature display panel”	
Containerization	The proposed incinerators shall be able to be completely packed 
into a series of 20ft export standard sea containers.	 Warranty period: 	“Warranty 
will be as per the UNOPS ‘contracts for the provision of goods’ under section 4.5 
of the ‘general conditions of contract’                                                                                                                                                            4.5 WARRANTIES: Unless otherwise specified 
in the Contract, in addition to and without limiting any other warranties, remedies or 
rights of UNOPS stated in or arising under the Contract, the Contractor warrants and 
represents that: 4.5.1 The goods, including all packaging and packing thereof, conform to the specifications of the Contract, are fit for the purposes for which such goods are ordinarily used and for any purposes expressly made known in writing in the Contract,
 and shall be of even quality, free from faults and defects in design, material, manufacturer and workmanship;		
The secondary chamber must comply with the following minimum criteria:	
	“• Heavy steel construction
• An excess air and high temperature operational mode.
• Sufficient size and appropriate geometry to achieve a gas temperature of at least 
1000 Celsius for a retention time of at least 2 seconds when pre-heated and correctly operated.
Optional maintenance service	The contractor shall deploy an expert, fully equipped 
with all required tools and equipment, to the client to provide maintenance service
 of the installed waste incinerators, including all the parts and components (e.g., burners,
 ignitors, temperature gauges) when required.  	






