Skip to content

Waste Incinerator

Get in touch with HICLOVER: +8613813931455 (Mobile/WhatsApp)|www.haiwos.net

Menu
  • Home
    • About
    • Air Filters
    • Ebola Incinerator
    • Russia Incinerator
    • Incinerator Blog
  • HICLOVER Incinerators
    • Twitter
    • Wastecos
    • Youtube
    • Somali Incinerator
    • Facebook
  • Waste Incinerator
    • Sudan Incinerator
    • Ethiopia Incinerator
  • Blogs
    • Gallery
    • Mali Incinerator
    • News
    • Rwanda Incinerator
    • Iraq Incinerator
    • Medical Waste Incinerator
  • Contact
    • Buy Online
    • Afghanistan Incinerator
    • Espanol
    • Francais
    • Tanzania Incinerator
  • Store

Tag: double chamber incinerator

double chamber incinerator

No Comments
| high temperature incinerator

Nanjing Clover Medical Technology Co.,Ltd. • Also consider provision for meeting international emission standards. Able to handle an average waste production of 100kg/day “• Minimum load capacity: 20 kg • Maximum load capacity: 40 kg • Nominal burning rate: 10-30 kg/hr (= 80- 240 kg range per 8hour day) The proposed incinerator units must be complete and include all of the key features listed below and all of the associated support services and interconnections The forecasted feedstock loads, and daily loading rates are generally summarized as: • Mixed general, clinical and incinerable hazardous wastes with a wide range of calorific values and densities.   The wastes will consist of 100% biomedical wastes. • Wastes either small enough to fit within a 60 litre waste sack or broken up or shredded to less than 300mm in size. • Operation on a daytime shift basis, 5 days per week. • An 8 hour daily operating cycle of ash removal, pre-heat and burn with continuous loading if required.  The automated burn completion  Principle Medical Waste Incineration Treatment Burn Rate Average 1000-1500 kg/hour Feed Capacity Average 6000kg/feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 4800Liter  Internal Dimensions 400*120*100 cm The Incinerator units shall be designed to last in operation in a tropical environment for a minimum period of 10 years if the specified maintenance schedule is followed. All metal surfaces (except combustion chamber internal fittings) shall be either galvanized, enameled, painted or otherwise treated against atmospheric and process induced corrosion The incinerator combustion chamber(s) should be designed for easy maintenance of all internal parts including the refractory and insulation. Materials used in the individual parts of the incinerator shall be heat resistance and also be protected against oxidation, corrosion, etc.o C.E = (CO2 X 100) / (%CO2 +%CO) incinerator price incinerator for medical waste Suitably designed pollution control devices such as scrubbers, filters or electrostatic precipitators, shall be installed/retrofitted with the incinerator to achieve emission limits.” “Each unit shall include a complete vertical exhaust and stack system, including the following features: • Steel construction. The proposed incinerators shall be able to be completely packed into a series of 20ft export standard sea containers. • Refractory lining in the lower section. • The exit height of the stack shall be not less than a range of 3-12 metres above ground level depending on the capacity of the incinerator unit.  The incinerator shell shall be made of mild steel with an adequate thickness for small units of between 3-6mm and larger units 5-10 mm depending on the construction part and painted externally with heat resistant aluminum paint suitable to withstand 250° C.  The outside surface temperature of the incinerator casing should not exceed 50° C above ambient temperature and shall include a safety mesh around all hot surfaces. Cold face refractory lining of calcium silicate or superior material, minimum thickness 100 mm.  The incinerator units shall include a temperature based electronic combustion control system that utilizes temperature and other data to inform automated or programmed cycling through the standard burn cycle: pre-heat, burn with waste addition, burn completion, cool-down. The system shall be capable of varying auxiliary fuel and air supply in both combustion chambers to achieve optimum combustion conditions. As far as practicable, the incinerator shall be of a plug and play type for ease of installation and commissioning in remote locations. “The control system shall have a separate push button-based work station, which shall be located adjacent to the loading bay and protected from weather and impact damage. The system shall allow for rapid and straightforward intervention by the operator if the automatic system is not achieving the desired results during a burn cycle.  e. achieve a Total Organic Carbon (TOC) content in the slag and bottom ashes of less than 3%. g. include clearly readable system operation panels. h. include an operator’s manual (in English and French and Spanish). i. require minimal preprocessing i.e. there shall be no/very limited need for prior sorting, crushing or shredding. j. be capable of handling mixed solid waste streams and incinerable hazardous wastes as indicated. k. can accommodate large variations in waste composition and calorific value. l. allow for batch loading The control system shall include an electronic performance monitoring and logging system. The system shall be capable of monitoring and logging chamber temperatures at regular intervals (not less than once per minute, with the capacity to vary the logging frequency). The system shall include the capacity to download the performance data by USB connection.  All the measuring devices attached with the incinerator should have digital display and should have provision of connecting to the recording system, which should include fuel meter and separate energy meter. The temperature shall be determined against the inside wall of the combustion chambers. An audible and visible alarm shall be installed to warn the operator when the secondary temperature drops to below the required temperature. The primary chamber must meet or exceed the following criteria: • Multiple electric ignition fuel burners designed to use automotive diesel fuel. • Flame of the primary burner shall be oriented towards the center of the unit which does not impinge directly on the refractory floor or wall. The secondary burner shall be positioned in such a way that the flue gas passes through the flame.  • The unit shall prevent leakage of the hot flue gas and any backfire.  […]

Read More »

Learn The Five Key Debt Reduction Steps You Must Take Immediately!paper incinerator

No Comments
| 2021

Step 1. The purpose of this first step is to bring you back to reality. You must know exactly how much money you owe and to whom you owe it. * Collect all of you unpaid bills and any other evidence of your outstanding debts. * List each outstanding bill on the same sheet of […]

Read More »

Information on Pubg Mobile iOSincinerate

No Comments
| 2021

Description PLAYERUNKNOWN’S BATTLEGROUNDS goes mobile – the original Battle Royale game is now available on your device! 1. Official PUBG on Mobile 100 players parachute onto a remote 8×8 km island for a winner-takes-all showdown. Players have to locate and scavenge their own weapons, vehicles and supplies, and defeat every player in a graphically and […]

Read More »

Why Every Business Should Have a ‘Hazardous Waste Management Plan’hazardous waste disposal

No Comments
| 2021

When it comes to waste management, having a disposal plan in place is imperative. Hazardous waste is heavily regulated, and thus cannot just be tossed out with your everyday trash. To know if you’re handling potentially dangerous waste, the first step is to assess its characteristics. When categorizing this type of waste, look out for […]

Read More »

Benefits of Cremationincinerator

No Comments
| 2021

When considering the final resting place of a loved one, there are two options: traditional burial and cremation. As the advantages of the latter become more universally known, more people are opting for this process. Reduced Costs Cremation enables people to spend less money in funeral expenses because of the elimination of the embalming step, […]

Read More »

Posts pagination

1 2 … 9 Next

www.clover-incinerator.com

HICLOVER.COM

https://www.youtube.com/watch?v=BxiEa3XYvBs

Contact Us

Tel: +86-25-8461 0201
Mobile: +86-138139 31455
WhatsApp: 008613813931455
Twitter ID: @hiclovercom
Wechat: 008613813931455
Website1: www.hiclover.com
Website2: www.clover-incinerator.com
Email1: [email protected]
Email2: [email protected]
Email3: [email protected]
Email4: [email protected]

Incinerator Video

https://www.youtube.com/watch?v=CDdacp1wk1A

Medical Environmental

Waste Incinerator

Recent Posts

  • Sustainable Animal Waste Incineration Solutions in Africa: HICLOVER Expands Its Reach
  • HICLOVER Medical Waste Incinerators for Afghanistan’s Expanded Immunization Program
  • HS CODE 84178050 for Waste Incinerators
  • HICLOVER TS50 PLC Animal Waste Diesel-Fired Incinerator Top Loading
  • Small-Scale Medical Waste Incinerators in Togo
  • HICLOVER Containerized Incinerators for Biohazard Waste Treatment
  • HICLOVER TS200 PLC Incinerator: Advanced Waste Disposal Solution Tailored for South Sudan
  • Incinérateur de déchets médicaux au Bénin
  • Small Medical Waste Incinerators in Rwanda
  • Advanced Waste Solutions for Libya’s Oil Fields
  • What’s Model of Hospital Incinerator for 240-bed hospital in Algeria
  • how to manage hospital waste
  • TECHNICAL SPECIFICATIONS FOR INCINERATOR– 50 KGS/HR
  • PLC based control box for incinerator
  • HOSPITAL WASTE INCINERATOR incineration Secondary Chamberincineration Secondary Chamber
  • Medical Waste Incineration and Medical Incinerators
  • HOSPITAL WASTE INCINERATOR hospital waste management system
  • discuss the design and operation or various types of incinerators
  • clinical waste treatment 5kgs 10kgs 20kgs and 30kgs per hour average
  • HICLOVER Mobile Containerized Incinerators
  • DOMESTIC INCINERATOR, YD 300 Spare Parts for Waste Incinerators and Burners
  • Containerized Mobile Incinerator
  • Model TS10 Incinerator with wet scrubber (Spray Tower) and Defogging Tower
  • large scale incinerator
  • double chamber incinerator
  • General waste incinerator with automated feeding system
  • Industrial hazardous and nonhazardous waste and medical infectious waste
  • industrial waste incinerator
  • Vertical closed incinerator combustion chamber
  • Waste Incinerator Capacity average 30-50 kgs per hour
  • Waste Incinerator HICLOVER TS100
  • Incinerator Items/Model HICLOVER TS20(PLC)
  • HICLOVER TS300(PLC) PLC Automatic Waste Incinerator
  • INDUSTRIAL WASTE INCINERATORS FOR ALL SITES
  • Medical waste incinerator Burning Rate 100kg/hr
  • Waste Incinerator YD500(PLC) and YD600(PLC)
  • medical wasteincinerator manufacturers
  • incinerator for hospital
  • Repair hospital incinerator
  • TS30 Model Waste Incinerators
  • BANGLADESH Incinerator (Model TS20 Gas with wet scrubber)
  • Trinidad and Tobago INCINERATOR.Q&A
  • Municipal waste incinerator
  • Drum type incinerator
  • CONTAINERIZED INCINERATOR
  • WASTE INCINERATOR TREATMENT – TS300( PLC)
  • spare parts for Rilleo burners
  • HS Code for waste incinerator 84178050
  • About Us HICLOVER
  • Pet Cremation

Tags

animal incinerators china waste incinerator container Incinerator domestic incinerator from:hiclovercom garbage incinerator garbage incinerators general waste incinerator hospital incinerators incinerador incinerate incineration of medical waste incineration of solid waste incineration process incinerator incinerator for sale incinerator manufacturer incinerator manufacturers incinerator price incinerators incinerators china incinerators for sale industrial waste incinerator laboratory incinerator large scale incinerator Medical medical incinerator medical incinerator manufacturers medical waste medical waste incineration medical waste incinerator medical waste incinerator for sale medical waste incinerators Mobile Incinerator municipal solid waste incinerators municipal waste incinerator pathological waste incinerator portable incinerator small incinerator solid waste incinerator solid waste incinerators waste waste incineration waste incinerator waste incinerators

HICLOVER.COM

Waste Incinerator 2025 . Powered by WordPress