Skip to content

Waste Incinerator

Get in touch with HICLOVER: +8613813931455 (Mobile/WhatsApp)|www.haiwos.net

Menu
  • Home
    • About
    • Air Filters
    • Ebola Incinerator
    • Russia Incinerator
    • Incinerator Blog
  • HICLOVER Incinerators
    • Twitter
    • Wastecos
    • Youtube
    • Somali Incinerator
    • Facebook
  • Waste Incinerator
    • Sudan Incinerator
    • Ethiopia Incinerator
  • Blogs
    • Gallery
    • Mali Incinerator
    • News
    • Rwanda Incinerator
    • Iraq Incinerator
    • Medical Waste Incinerator
  • Contact
    • Buy Online
    • Afghanistan Incinerator
    • Espanol
    • Francais
    • Tanzania Incinerator
  • Store

Category: waste-incinerator

Incinerator Ignition by Diesel

No Comments
| waste-incinerator

1.       Petrol: diesel 2.       Consumption: 8-10liter/hour 3.       Capacity: to cremate (carrion and spoils) 350-400kg/hour 4.       Temperature: 900-1350?C 5.       Operation temperature: -30~40?C 6.       Incinerator weight: 1800-2000 kg 7.       Volume: 0.70-0.80m/cube 8.       Exterior dimension: 1.4-1.6*1.0-1.15m (L*W) 9.       Trial able 10.   Incinerator mouth size: 50-60cm (W), 65-75cm (L) Ignition by Diesel Minimum burning temperature 1200 Celsius Burning capacity of 20 Tons per day. Cooling by water Burn Rate 100Kg/h Shipping Weight 4000kg Capacity 300Kg MINIMUM Max. Burn out time 3.0 hrs. Avg. Ash Residue 3% Heavy Duty refracting lining to withstand 15000C Min. Operating Temperature 8500C Max. Operating Temperature 14500C Residency Time in Secondary Chamber 2 sec. Density Insulation (high) 22mm Avg. Fuel Consumption p/hr 7 to 9ltr Fuel Dual, box & Oil/Diesel Temperature Monitoring YES Auto ignition YES Refractory Casting (min.) 65mm Refractory Casting (min) 65mm INCINERATORS Biological waste disposal system (INCINERATOR).  Incinerator must meet the following specifications: Combustion Capacity (kW) = 581 ±10%  Combustion Capacity (kcal/h) = 500,000±10%  Combustion Capacity – Solid waste IMO spec, (kg/h) = 100  IMO spec. (I/charge)       Minimum Zero 0 to Maximum = 250  Combustion Capacity – Sludge oil IMO spec, (l/h) (at 20% water content) -66±10%  Max. l/h (at approx. 50% water content) = 100 ±10%  Weight approx. (kg) = 4,850 ±10%  Related posts: Leading Waste Incinerator Smallest Waste Incineration Into Energy System Incinerator Hazardous Waste Incinerators

Read More »

Smaller cremators incinerators

No Comments
| waste-incinerator

Smaller cremators that will run diesel and will be capable of doing all the other dogs/cats/pets that we have. We only cremate pets individually so this is what we require. Have your company as member of Markis Hospital waste management group as planer or supplier, contractor of solutions or operating partners of the solution of hospital waste management in the projects we are developing, starting with Larissa and Volos. Members of Markis waste management group will also have the possibility to provide training and technical services to the health sector of Greece and other countries via the TSC which we plan to make the same time in Larissa (enclosed diagram indicates the role of each party joining Markis waste management group). ● Able to burn 25-30kg per hour ● Consist of two chambers to ensure significant reduction in emission ● Be capable of temperature in range of 800c to 1000c ● Low maintenance design ● Must be Diesel fuelled ● Need more than 15amp 220- 250V power ● kW Consumption power consumption to be stated ● Onboard or in-built fuel storage storage tank & should use no more than 12L of dies el per hour to burn 25-30kg of waste ● Solid waste reduction in range of 90-97% ( should be routinely achieved) 1. –  2 medical waste autoclaves 350ltr and 100ltr 2. – 1 medical waste shredder 3. –  3 medical macerators 4. – 27 Waste transfer trolleys. Related posts: Process Engineering Design of Pathological Waste Incinerator Incinerator Combustion Capacity Incinerator for Laboratories Stoven to Cremated Pets

Read More »

One chamber incinerator

No Comments
| waste-incinerator

One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit? Related posts: Containerized Mobile Incinerator Top Feeding Door HICLOVER 10-500kgs/Hr.Double Combustion Chambers Waste Incinerators Waste Incineration Treatment BURNING RATE : 100-150kgs per hour HICLOVER TS150 […]

Read More »

One chamber incinerator

No Comments
| waste-incinerator

One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit? Related posts: Technical Requirements for Medical Waste Incinerator Incinerator Double Burner with 50 Kg/Hr Capacity Hospital Incinerators 50 Kg/Hr Capacity Waste Clinic Incinerator

Read More »

islands incinerators

No Comments
| waste-incinerator

Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately   Autoclave or microwaves  separately   temperature monitor  attached outside of machine operating  Fuel and electric   –          Toxic and dangerous wastes,   –          Medical pharmaceutical and hospitable liquids  Wastes –          Domestic garbage   –          Electric and electronic wastes –          Industrial wastes –          In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before 4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai 5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system.  please send me the price and catalog for this item 6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog 7) 2 units 1.5 tonne Fork Lift  ( if you know good price and quality  company in china) 8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers. 9) Spare Parts For 2 Years Operation & Maintenance  for YD-300 and for the above machines 10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted The highest temperature that the filter bag can operate continuously is 260C.    In order to add a bag house using our filter products,  you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C.    If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.   Related posts: waste incinerator HICLOVER […]

Read More »

Posts pagination

1 2 … 349 Next

www.clover-incinerator.com

HICLOVER.COM

https://www.youtube.com/watch?v=BxiEa3XYvBs

Contact Us

Tel: +86-25-8461 0201
Mobile: +86-138139 31455
WhatsApp: 008613813931455
Twitter ID: @hiclovercom
Wechat: 008613813931455
Website1: www.hiclover.com
Website2: www.clover-incinerator.com
Email1: [email protected]
Email2: [email protected]
Email3: [email protected]
Email4: [email protected]

Incinerator Video

https://www.youtube.com/watch?v=CDdacp1wk1A

Medical Environmental

Waste Incinerator

Recent Posts

  • HICLOVER TS20: Eficiencia y Seguridad con un Incinerador de Carga Superior
  • Airport and Aviation Maintenance Waste Incineration Solutions
  • High-Temperature Animal Incinerators for the Food Processing & Slaughter Industry
  • Sustainable Animal Waste Incineration Solutions in Africa: HICLOVER Expands Its Reach
  • HICLOVER Medical Waste Incinerators for Afghanistan’s Expanded Immunization Program
  • HS CODE 84178050 for Waste Incinerators
  • HICLOVER TS50 PLC Animal Waste Diesel-Fired Incinerator Top Loading
  • Small-Scale Medical Waste Incinerators in Togo
  • HICLOVER Containerized Incinerators for Biohazard Waste Treatment
  • HICLOVER TS200 PLC Incinerator: Advanced Waste Disposal Solution Tailored for South Sudan
  • Incinérateur de déchets médicaux au Bénin
  • Small Medical Waste Incinerators in Rwanda
  • Advanced Waste Solutions for Libya’s Oil Fields
  • What’s Model of Hospital Incinerator for 240-bed hospital in Algeria
  • how to manage hospital waste
  • TECHNICAL SPECIFICATIONS FOR INCINERATOR– 50 KGS/HR
  • PLC based control box for incinerator
  • HOSPITAL WASTE INCINERATOR incineration Secondary Chamberincineration Secondary Chamber
  • Medical Waste Incineration and Medical Incinerators
  • HOSPITAL WASTE INCINERATOR hospital waste management system
  • discuss the design and operation or various types of incinerators
  • clinical waste treatment 5kgs 10kgs 20kgs and 30kgs per hour average
  • HICLOVER Mobile Containerized Incinerators
  • DOMESTIC INCINERATOR, YD 300 Spare Parts for Waste Incinerators and Burners
  • Containerized Mobile Incinerator
  • Model TS10 Incinerator with wet scrubber (Spray Tower) and Defogging Tower
  • large scale incinerator
  • double chamber incinerator
  • General waste incinerator with automated feeding system
  • Industrial hazardous and nonhazardous waste and medical infectious waste
  • industrial waste incinerator
  • Vertical closed incinerator combustion chamber
  • Waste Incinerator Capacity average 30-50 kgs per hour
  • Waste Incinerator HICLOVER TS100
  • Incinerator Items/Model HICLOVER TS20(PLC)
  • HICLOVER TS300(PLC) PLC Automatic Waste Incinerator
  • INDUSTRIAL WASTE INCINERATORS FOR ALL SITES
  • Medical waste incinerator Burning Rate 100kg/hr
  • Waste Incinerator YD500(PLC) and YD600(PLC)
  • medical wasteincinerator manufacturers
  • incinerator for hospital
  • Repair hospital incinerator
  • TS30 Model Waste Incinerators
  • BANGLADESH Incinerator (Model TS20 Gas with wet scrubber)
  • Trinidad and Tobago INCINERATOR.Q&A
  • Municipal waste incinerator
  • Drum type incinerator
  • CONTAINERIZED INCINERATOR
  • WASTE INCINERATOR TREATMENT – TS300( PLC)
  • spare parts for Rilleo burners

Tags

animal incinerators china waste incinerator container Incinerator domestic incinerator from:hiclovercom garbage incinerator garbage incinerators general waste incinerator hospital incinerators incinerador incinerate incineration of medical waste incineration of solid waste incineration process incinerator incinerator for sale incinerator manufacturer incinerator manufacturers incinerator price incinerators incinerators china incinerators for sale industrial waste incinerator laboratory incinerator large scale incinerator Medical medical incinerator medical incinerator manufacturers medical waste medical waste incineration medical waste incinerator medical waste incinerator for sale medical waste incinerators Mobile Incinerator municipal solid waste incinerators municipal waste incinerator pathological waste incinerator portable incinerator small incinerator solid waste incinerator solid waste incinerators waste waste incineration waste incinerator waste incinerators

HICLOVER.COM

Waste Incinerator 2025 . Powered by WordPress