Laboratory waste Management system 01. Liqued water purification system. July 6, 2021 | No Comments Laboratory waste Management system 01. Liqued water purification system. 02. Number of laboratories – 05 03. The estimated liquid water waste – 6000 L including a. chemicals b. toxins c. Bio Hazardous materials. Temporary allocated space for purifications system- 30×20 The following should be indicating in the biding document 1.Method of disposing treated waste water 2.Method of discarding the sludge 3.To follow ISO standard/regulations of Central Environment Authority[CEA] 4.Time frame for construction 5.Request the cost for each item of the project [Consultancy/designing/construction] as well for the whole project. 6.Warranty period and maintaincne. a. Pre-assembled, containerized type b. Burning rate: 100 – 120kg / hour c. Minimum operating temperature: 8500c (Primary combustion) d. Maximum operating temperature: 14500c (afterburner chamber) e. Secondary Burning capacity: Compulsory. f. Density insulation: 20 mm high g. Refractory casting: minimum 65mm h. Heavy duty refracting lining to withstand 15000c i. Average burn out time: maximum 3.0 hrs j. Fuel type: fuel oil (diesel) k. Fuel consumption in L/hr: 7.5 to 9 l. Residency time in secondary chamber: 2 secs. m. Residue ash post 100kg Max 3.8 kg n. Installation period Maximum 7days. Related posts: Technical Requirements for Medical Waste Incinerator Incinerator Double Burner with 50 Kg/Hr Capacity Hospital Incinerators 50 Kg/Hr Capacity Waste Clinic Incinerator