Requirements for Dual Chamber Burner

INCINERATOR DESCRIPTION
The Model is for up to 300kgs ability per batch tons as well as will certainly shed at around 55kgs per hour.
The unit has leading packing style and has a strong refractory concrete lining for optimum heat retention. Device have large leading cover for very easy loading, as well as specifically designed front ash door, for ash removal.
This unit runs at over 1100 ° C in the key chamber to guarantee complete combustion. This model also benefits
from a heavy duty secondary chamber as well as burner which makes certain a full re-burn of any smoke as well as exhausts as well as a 0.5 2nd gas retention time.
Melt rate 150kg/h minimum
Secondary Chamber Yes.
Gas Retention Time 2 seconds.
Gas Diesel/LPG/LNG.
Power Supply for Control Box 220V-240V 50Hz solitary stage.
Minimum Operating Temperature Level 920 ˚C

PRIMARY CHAMBER.
Durable steel case.
Excellent quality refractory lining and insulation.
Huge full dimension leading load door and liquid retention sill.
1 x diesel oil terminated ignition heaters operated on/off.
ADDITIONAL CHAMBER.
Heavy-duty steel housing.
Top quality refractory lining as well as insulation.
1 x diesel oil fired ignition heaters operated on/off.
Requirements for Double Chamber Incinerator:.
Primary Burning.
The main combustion chamber shall be approved as the key burning area.
The minimum combustion temperature of the key chamber shall not be less than 800 degrees c.
Secondary Combustion.
The house time in the second chamber will not be much less than 2 secs.
The gas temperature level as measured versus the inside wall surface in the secondary chamber, not in the fire zone will not be less than as suggested in Whole lot 1-7.
Both the main and also secondary temperatures shall be preserved till all the waste has been entirely combusted.
Chimney.
The chimney shall have a minimal height of 4 metres above ground level.
The minimal exit speed of the emissions will not be less than 10metres/second.
Temperature Warnings.
A distinct and/or noticeable alarm to alert the operator when the second temperature level drops to listed below the needed temperature.
General.
Control box can be separated and also installed on different stand of atleast 1.5 metres from the burner at approximately 1.6 metre elevation.
CE certified or equivalent for incinerators of this dimension and also design.
Drawings as well as images for the provided whole lots.
1 year spare parts, fuel tanks as well as 10metre pipe to come common with every burner.
Specs for Mobile Burner Units.
Trailer mounted mobile incinerator devices ideal for the following applications.
Medical waste.
Residential waste.
Industrial waste.
Animal cadavers.
SMOKESHAFT.
Durable stainless steel case.
1.5 m size.
0.6 m refractory lined stack.
CONTROL PANEL.
Control of 1 heater.
Timer control 0- 12 hrs.
Essential fan timer control.
Temperature Tracking.
Thermostatic Control.
Automatic Control.
Cycle time established.
ANCILLARIES.
Operating as well as maintenance handbooks.
Saves listing.
CONTAINERISATION.
incinerator totally installed within 10 ft ISO accredited container.
3,5 kwA electrical power generator, 1000 litres fuel storage tank.
Incinerator mounted on the silenblock padding.

Open chat